Community Hall, Worcester – Acoustic Improvement Strategy

Client
Worcester Community Centre

Location
Worcester

Project Type
Refurbishment Acoustic Advice

Estimated Value
Not stated

Scale
Main hall with seating for approximately 100 people, plus additional function rooms


 Project Overview

The Worcester Community Hall refurbishment presented a combination of acoustic challenges typical of older multi-use buildings. Excessive reverberation within the main hall affected speech intelligibility and usability, while weak internal sound insulation limited simultaneous use of adjacent spaces.

Kimber Acoustics was appointed to assess existing conditions and provide proportionate acoustic improvement advice suitable for retrofit within a constrained and occupied building.

Scope of Acoustic Services

Our work included site surveys and analysis to quantify reverberation characteristics and identify sound transmission paths between spaces. Retrofit solutions were developed to address both internal room acoustics and sound insulation performance, taking account of limited available space and budgetary constraints.

Costed options were provided for reverberation reduction measures and targeted wall upgrades, allowing the client to compare effectiveness and affordability before proceeding.

Outcome

The recommended strategy provided a clear, practical route to improving acoustic performance without unnecessary disruption. A contractor was appointed based on our advice, enabling the community centre to progress refurbishment works with confidence that the hall would better support its intended uses.

Emily Lewis

Emily Lewis is the Founder of TwoFold and a Squarespace Website Designer. Based in the UK.

Having spent years working for a marketing agency and as an in-house Marketer, Emily started her own website design company with marketing at the forefront. She has been a finalist for South Wales Business Awards Young Entrepreneur of the Year 2023, as well as UK Paid Media Awards 2022 'Best Use Of LinkedIn Ads'.

https://twofold-studios.com/
Previous
Previous

Battersea Bridge Road – Post-installation Mitigation Review

Next
Next

DWP Pontypridd – Building Vibration Investigation